Attn: Realtors
         Contractors


Realtors Benefit

Normal Commission
10% for selling raw land.

Finder's Fee
Finder’s fee for prospects to Hickory Cove Services,
LLC LLC – recommend
5% of the appraisal minus the property lot. This 5% is added to the construction cost.  The realtor must tell the customer that 5% is added to the construction loan for their fee (paid 14 days after dry-in).

Turnovers
Occasional “turnovers” for prospects that decide they want a completed home now – earn regular commission from brokerage firm.

HCS Team Member
Stay in touch with representative on a weekly basis.

 
Contractors:

•Reduce Construction Time On Each Job  
Because the shell framing and trusses are all made off site, the job goes a lot quicker on site. The walls, complete with hung windows and siding if ordered that way, go up the first day. Internal framing can be done at the same time. Trusses go up the next day or two. Deck and black in the roof and the house is dried in. It all takes four or five days on single story houses.

•Reduce Your Time On The Job Site
Because the owner is the builder and you are a consultant, the owner does the supervision. The consultant sees the house through dry-in, then turns it over to the owner. From then on, the consultant contractor is expected to be on site a couple of hours a week to help the owner assess the quality of work done and plan for the next week. 

•Get Out From Under Worker’s Compensation On Subs 
The owner, as a non-professional builder operates with lien waivers from subs who carry their own worker’s compensation insurance. 

•Bring In An Excellent Product You Can Be Proud Of 
All fir or spruce 2x4 or 2x6 knee braced studs on pressure treated plates – double 2x10 headers per plan –1/2” CDX plywood sheathing – 2x4 double top plates – all 5/8” CDX plywood roof decking on 2x6 yellow pine rafters or wood trusses on beams per plan at 24” oc with 12’ overhangs – 3/8” rough sawn pine soffit with continuous vent system – CDX gable sheathing – gable vents – cedar fascia and frieze board – 2x6 subfascia – flooring using 3/4” T&G plywood on 2x10 southern pine joists at 16” oc – factory jig construction in panels using all kiln dried materials exposed to weather for the first time on your building site. 

      Builder Requirements as “Site Consultant”:

•Assist buyer with bids. 
•Obtain permits. 
•Obtain temporary power. 
•Get foundation in place. 
•Get shell dried-in with shingles on the roof. 
•Take one trip a week to the site for about 12 weeks. 
•First to look at the work performed by subs after dry-in. 
Make notes on what might be wrong. 
•Second to meet with owners for an hour to discuss current and following
weeks work. 
•One 2 hour meeting per week with the owner at the site. 
•Complete “turnkey” houses at a predetermined price. 
•Optional plan
 
Optional plan for the builder to complete entire house is available at additional cost.
 